Plantation Community Church
Address: 6501 West Broward Blvd., Plantation, Florida
The church will have all storefront doors and windows with impact glass.
The entrance foyer will have four meeting rooms and two restrooms.
The main sanctuary will have a 450 capacity and will be furnished with pews. The sanctuary will also contain a choir loft, portable stage and a baptistry area. All interior doors will be wood with wood trim.
The sacristy area will have two dressing rooms and a complete kitchen area with cabinets and appliances.
There will be seven individual air conditioning units that are set on a mezzanine deck. Sidewalks and sitting areas will go on the outer perimeter of the building, along with yard lighting. A lift station is installed for the sanitary sewer system. Complete landscaping and irrigation systems will be installed. Running parallel to the building will be a new road with curbs and sidewalks.
Owner: Plantation Community Church
User Agency: Plantation Community Church
(Expected) Date of Completion: April 2007
Project Size: Building is 8,404 Square Feet
Firm's Responsibility: General Contractor
Staff Responsibilities: Project Management
Architect: Architecnic
7504 Wiles Road, Suite 102-A
Coral Springs, FL 33067